Hi,
I maintain component scrap % for a material.
When they run MRP and the scrap % will be included in MRP for that component.
They create a production order and when confirming the order in the goods movement they want scrap not to be included.
Example.
for production of 1 X we need 100 A components with scrap % maintained as 2%
When MRP is run for 1 X then components are planned as 102 A.(this is OK)
When the production order is created and when it is getting confirmed the system will show the component A consumption for 261 movement type as 102 A quantity, which includes scrap % also.
Requirement is when the order is being confirmed the goods movement proposal while backflushing should not include scrap %. instead of 102 it should propose only 100.
Please help