Hi,

 

I maintain component scrap % for a material.

 

When they run MRP and the scrap % will be included in MRP for that component.

 

They create a production order and when confirming the order in the goods movement they want scrap not to be included.

 

Example.

 

for production of 1 X we need 100 A components with scrap % maintained as 2%

 

 

When MRP is run for 1 X then components are planned as 102 A.(this is OK)

 

When the production order is created and when it is getting confirmed the system will show the component A consumption for 261 movement type as 102  A quantity, which includes scrap % also.

 

Requirement is when the order is being confirmed the goods movement proposal while backflushing should not include scrap %. instead of 102 it should propose only 100.

 

Please help