Hi Experts,
I'm working with PPDS and testing the CIF integration models. The model for PIRs (Primary independent requirements) works Ok when the requirements are transferred from ECC to APO, but when the PIR is created directly in PPDS is not transferred to ECC.
¿The PIR Demand generated in APO should be able to be transferred to ECC?
When I run the delta report (/SAPAPO/CCR) it shows the consistency error related with that PIR, but the only available option is to delete it from APO.
Thanks,
Jorge